搭设加工棚的技术措施是什么
工地上安装木工加工棚的目的是为了增强加工棚的系数,防止工人在施工的时候,出现危险,造成更大的伤害,为此我们要为施工场所搭建加工棚,下面我们将为大家详细的总结一下搭建加工棚的技术措施。
The purpose of installing the woodworking shed on the construction site is to enhance the safety factor of the processing shed and prevent workers from being exposed to danger and causing greater harm during construction. Therefore, we need to build the processing shed for the construction site. Now we will summarize the safety technical measures for building the processing shed in detail.
1、钢筋棚立杆在浇筑混凝土楼板上搭设,铺跳板和垫板。
1. The vertical pole of the reinforcement shed shall be erected on the poured concrete floor, and the springboard and base plate shall be paved.
2、定期检查钢筋棚,发现问题和隐患,施工前及时维修和加固,以达到稳固稳固,确保施工。
2. Regularly check the reinforcement shed, find problems and hidden dangers, and timely repair and reinforce them before construction to achieve stability and ensure construction safety.
3、钢棚搭设人员要持证上岗,并正确使用帽、带,穿防滑鞋。
3. The steel shed erection personnel shall work with certificates, correctly use helmets, safety belts and wear anti-skid shoes.
4.严禁将脚手板放在地面上。铺设脚手板和多层作业时,尽量平衡施工荷载的内外传递。
4. It is forbidden to put the scaffold board on the ground. When laying scaffold boards and multi-layer operations, try to balance the internal and external transmission of construction loads.
5、在围栏周围设置绳索或竖立警示牌,地面应设专人指挥,禁止非操作人员进入。
5. Ropes or warning signs shall be set up around the fence, and special personnel shall be assigned on the ground to command and prohibit non operators from entering.
6、钢筋棚支搭,经项目部员验收合格后方可使用。
6. The steel bar shed can be used only after being accepted by the safety officer of the Project Department.
7、严格控制施工荷载,脚手架不得集中堆放荷载,以保证更大的储备。
7. The construction load shall be strictly controlled, and the scaffold shall not be stacked with loads in a centralized way to ensure greater safety reserve.
加工棚搭设和拆除时,应避免上下同时作业,错开作业时间。架设和拆除加工棚时,所有材料和工具应堆放在建筑物外缘少2m以内,堆放高度不得超过1m。拆除的材料需要及时转移到地面并运走,严禁高空抛掷。
During the erection and removal of the processing shed, it shall be avoided to work up and down at the same time and stagger the operation time. When erecting and dismantling the safe processing shed, all materials and tools shall be stacked within at least 2m of the outer edge of the building, and the stacking height shall not exceed 1m. The dismantled materials shall be transferred to the ground and transported away in time. It is strictly prohibited to throw them from high altitude.
在搭建和拆除加工棚时,应在地面设置警戒区,并派专人进行监控。搭建和拆除加工棚时,应有专人指挥。
When setting up and removing the safe processing shed, a warning area shall be set up on the ground and a special person shall be assigned to monitor it. When setting up and removing the safe processing shed, there should be a specially assigned person to command.
搭建加工棚的技术措施,上述内容中已经为大家详细的总结完了,我们了解到,加工棚在安装的时候,一定要做好材料之间的连接工作,棚子搭建完毕后,在安装和拆除的时候,应进行技术交底。
The safety technical measures for the construction of the processing shed have been summarized in detail. We understand that the processing shed must be well connected with materials during installation. After the construction of the shed, safety technical disclosure should be conducted during installation and removal.
雨天和大风天气应暂停加工棚的搭设和拆除施工,并检查和维护单柱加工棚的性。加工棚搭设完成后,经专职员验收合格后投入使用。在安装和拆除水平防护之前,应进行技术交底。关注我们http://www.jnpfjc.com,了解更多相关事项!
The erection and removal of the safe processing shed shall be suspended in rainy and windy days, and the safety of the single column processing shed shall be checked and maintained. The processing shed shall be put into use after being erected and accepted by the full-time safety officer. Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Follow us http://www.jnpfjc.com , learn more about it!
- 上一篇:施工围挡出现松动的原因有哪些
- 下一篇:临边防护栏的标准与大作用