木工加工棚的规范搭设做法有哪些?
木工加工棚是建筑工地上常用的设施,给建筑工程带来很大的便利,正确搭建规范的加工棚非常重要。下面,我们跟厂家来详细了解加工棚的规范做法。希望以下内容对您能有帮助。
Woodworking shed is a common facility on construction sites, which brings great convenience to construction projects. It is very important to correctly build a standardized processing shed. Next, we will learn more about the standard practices of the processing shed from the manufacturer. I hope the following contents can help you.
当临街通道、场内通道、出入建筑物通道、施工电梯及物料提升机地面进料口作业通道处于坠落半径内或处于起重机起重臂回转范围内时,设置加工棚及防护通道,以避免发生物体打击事故。
When the street side passage, the on-site passage, the passage to and from the building, the operation passage of the construction elevator and the ground feed inlet of the material elevator are within the falling radius or within the slewing range of the crane jib, the processing shed and the protective passage shall be set up to avoid the occurrence of biological strike accidents.
防护通道、加工棚应采用建筑钢管扣件脚手架或其他型钢材料搭设,严禁采用竹木杆件搭设加工棚。
The protective passage and processing shed shall be erected with scaffold of building steel pipe fastener or other profile steel materials. It is forbidden to erect processing shed with bamboo and wood rods.
防护通道及加工棚的顶部严密铺设双层正交竹串片脚手板或双层正交18厚木模板的水平硬质防护,及封闭的防护栏或挡板,整体应能承受10kPa的均布静荷载。塔吊主要经行线路、转料平台、卸料平台落物曲线范围内的防护通道及加工棚顶部严密铺设双层正交50厚木板。
The top of the protection channel and processing shed shall be tightly paved with double-layer orthogonal bamboo string piece scaffold board or double-layer orthogonal 18 thick wood formwork for horizontal hard protection, as well as closed protective fence or baffle, which shall be able to withstand a uniform static load of 10KPA as a whole. The tower crane mainly passes through the protective passage within the falling curve of the line, transfer platform and unloading platform, and the top of the processing shed is tightly laid with double-layer orthogonal 50 thick wood plates.
特别重要或大型的防护通道、加工棚及悬挑式防护设施制定专项技术方案,经企业技术负责人审批后实施。
Special technical schemes shall be formulated for particularly important or large protective passages, processing sheds and cantilevered protective facilities, which shall be implemented after being approved by the technical director of the enterprise.
防护通道净空高度和宽度应根据通道所处位置及人、车通行要求确定,高度一般不低于3.5m,宽度一般不低于3m。高度在15m以下建筑物,其进出口通道长度不低于3m;高度在15-30m的建筑物,其进出口通道长度不低于4m,高度超过30m的建筑物,其进出口通道长度不低于5m。
The clearance height and width of the protection channel shall be determined according to the position of the channel and the requirements for the passage of people and vehicles. Generally, the height shall not be less than 3.5m and the width shall not be less than 3m. For buildings with a height of less than 15m, the length of inlet and outlet channels shall not be less than 3m; For buildings with a height of 15-30m, the length of the inlet and outlet channels shall not be less than 4m; for buildings with a height of more than 30m, the length of the inlet and outlet channels shall not be less than 5m.
通道长度自脚手架外排立杆起算。立杆基础硬化处理,通道使用期内不得发生地面沉陷,立杆沿通行方向通长设置扫地杆和剪刀撑。常规防护通道立杆纵距不应超过1200mm,加工棚悬挑尺寸为300~500mm,双层加工棚层间距为500~600mm。
The length of the passage is calculated from the outer row of the scaffold. The foundation of the upright pole shall be hardened, and the ground shall not sink during the service life of the passage. The upright pole shall be provided with a sweeping pole and cross bracing along the whole length of the passage direction. The longitudinal distance between the vertical poles of the conventional protection channel shall not exceed 1200mm, the overhanging size of the processing shed shall be 300-500mm, and the interval between the layers of the double-layer processing shed shall be 500-600mm.
以上内容是厂家为大家介绍的关于加工棚规范做法,如果您不了解这个问题,可以参考文中讲述的内容,或者和我们联系http://www.jnpfjc.com,我们可以为您提供详细的解答和产品服务。
The above content is about the standard practice of processing shed introduced by the manufacturer. If you don't understand this problem, you can refer to the content in the text or contact us http://www.jnpfjc.com , we can provide you with detailed answers and product services.