木工加工棚搭建的目的是什么?木工加工棚是为了保护施工现场建筑材料,防止施工现场的物品被雨水淋湿而生锈,因此需要搭建加工棚进行保护,而且它的作用和特点特别的鲜明。
What is the purpose of the woodworking shed? The carpentry processing shed is designed to protect the building materials on the construction site and prevent the articles on the construction site from being wet by rain and rusting. Therefore, it is necessary to build a processing shed for protection, and its function and characteristics are particularly clear.
加工棚是为了保护施工现场的施工人员,用钢管作为支撑框架,用竹签或竹笆板或废弃模板覆盖作为防砸,或保护高压线等穿过加工棚的东西。一般双层保护是为了增加系数。
The processing shed is designed to protect the construction personnel on the construction site. The steel pipe is used as the support frame, and the bamboo stick or bamboo fence board or waste formwork is used as the anti smashing, or the high-voltage line and other things passing through the processing shed are protected. The general double-layer protection is to increase the safety factor.
加工棚是建筑施工过程中操作人员或人行的必经通道,过往人员的加工棚为双层。从悬挑脚手架的悬挑处开始,每隔十米设置一个加工棚,可以更好地保证加工棚下行走人员的。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a processing shed is set every ten meters to better ensure the safety of the walking personnel under the processing shed.
在施工过程中,在搭建加工棚时注意防护措施,施工人员按照施工要求进行施工,露天搅拌机位置、现场混凝土搅拌机、卷扬机棚、钢筋棚、木棚、部分出入口和现场厕所需要设置木工加工棚。
During the construction process, pay attention to the protective measures when building the processing shed. The construction personnel shall carry out the construction according to the construction requirements. The woodworking processing shed shall be set at the outdoor mixer position, the site concrete mixer, the winch shed, the reinforcement shed, the wooden shed, some entrances and exits and the site toilet.
水平保护安装和拆除前,进行技术交底。安装和拆除水平加工棚时,操作人员的“三宝”齐全并正确使用。加工棚搭设和拆除时,应避免上下同时作业,错开作业时间。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. When installing and removing the horizontal processing shed, the "three safety treasures" of the operators shall be complete and correctly used. During the erection and dismantling of the processing shed, the simultaneous operation of the upper and lower parts shall be avoided and the operation time shall be staggered.
安装和拆除加工棚时,所有材料和工具应堆放在建筑物外缘少2m处,堆放高度不得超过1m。拆除的材料及时传递到地面并运走,严禁高空抛掷。建造和拆除加工棚时,应在地面上设置警戒区,并派专人监控。
When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m. The demolished materials shall be delivered to the ground and transported away in time. Throwing from height is strictly prohibited. During the construction and removal of the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor.
建造和拆除加工棚时,应指定专人指挥。管理人员应注意眼、腿、口,采取有效的防护措施应对危险情况,确保人员。在雨天和大风天气,应暂停加工棚的搭设和拆除,并检查和维护加工棚的质量。
During the construction and removal of the processing shed, a special person shall be appointed to command. The management personnel shall pay attention to the eyes, legs and mouth, take effective safety protection measures to deal with dangerous situations and ensure personnel safety. In rainy and windy days, the erection and removal of the processing shed shall be suspended, and the quality of the processing shed shall be inspected and maintained.
加工棚搭设完成后,经专职员验收合格后方可投入使用。在搭设和拆除水平防护前,进行技术交底。
After the erection of the processing shed is completed, it can be put into use after passing the acceptance of the full-time safety officer. Safety technical disclosure shall be conducted before setting up and removing horizontal protection.
加工棚是建筑施工过程中操作人员或人行的必经通道,过往人员的加工棚为双层。从悬挑脚手架的悬挑处开始,每隔十米设置一个悬挑式加工棚,可以更好地保证加工棚下行走人员的。更多相关事项就来我们网站http://www.jnpfjc.com进行咨询吧。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a cantilevered processing shed is set every ten meters to better ensure the safety of the walking personnel under the processing shed. For more information, please visit our website http://www.jnpfjc.com Let's consult.