围挡施工的计划分为几个步骤
目前围挡的使用在市政各种项目施工是必不可少的建筑材料了,地铁施工、道路施工等项目使用都相当普遍。那么围挡施工的计划分为几个步骤具体是啥呢?
At present, the use of fencing is an essential building material in the construction of various municipal projects, and it is quite common in subway construction, road construction and other projects. So the plan of enclosure construction is divided into several steps. What is the specific step?
1:先将需要施工的面积进行规划,并且做出大致框架,普通为轻钢龙骨铺设镀锌铁皮,或者用废品轻钢废品围挡,或者是使用定桩将大致的安装路线分布出来。
1: First, plan the area to be constructed and make a rough framework. Generally, lay galvanized iron sheet for light steel keel, or fence with waste light steel waste, or use fixed piles to distribute the rough installation route.
2:在安装的时候一定要依次进行安装,这样可以让各个连接处都进行兼容,避免中途出现了缝隙或者是连接不上的问题出现。
2: The installation must be carried out in turn during installation, so that all connections can be compatible, so as to avoid the problem of gap or lack of connection in the middle.
3:燕尾丝或者U型射钉停止依次固定(固定间距以30-50cm),边缘与各个连接处的固定都应该相对密集一点,这也是为了让其有一个较长的使用寿命。
3: The dovetail wire or U-shaped shooting nail shall be fixed in turn (the fixed spacing is 30-50cm), and the fixing of the edge and each connection shall be relatively dense, which is also to make it have a long service life.
安装步骤地面硬化---膨胀螺丝固定立柱---组装围挡板与上下横杆---围挡板与立柱拼装成型(保证横平竖直)---基础墙砌砖加固---基础粉刷黄黑交替警示漆。
Installation steps: ground hardening - expansion screws fix the column - assemble the baffle and upper and lower cross bars - assemble the baffle and column into shape (ensure horizontal and vertical) - bricklaying and reinforcement of the foundation wall - Foundation painting yellow and black alternating warning paint.
围挡的高度、材料、布置、粉饰都有一定的规格,例如要求工地围挡高度不能小于2.5m;一般路段不低于1.8m。
There are certain specifications for the height, material, layout and decoration of the fence, for example, the height of the fence on the construction site should not be less than 2.5m; Generally, the road section is not less than 1.8m.
市政工程金属围挡板统一为蓝色或绿色,房建工程施工围墙统一为白色;工地大门要与围挡协调,并设置企业标志牌,门侧围挡要架设式样规范的“五牌一图”,进出现场的主要道路要硬化和绿化。对因特殊情况不能设置围挡的,则要求必须设置警示标志。
The metal fence of municipal engineering is blue or green, and the construction fence of housing engineering is white; The gate of the construction site shall be coordinated with the enclosure, and the enterprise signboard shall be set up. The enclosure at the side of the door shall be erected with "five signboards and one drawing" of standardized style, and the main roads entering and leaving the site shall be hardened and afforested. For those that cannot be barricaded due to special circumstances, safety warning signs must be set.
围挡高度为5米高,主体结构采用槽钢及角钢焊接,立柱基础为钢筋混凝土加预埋钢板加地脚螺栓;风荷载按8级风考虑;立柱间距不大于3米,槽钢具体型号及壁厚根据计算结果确定。
The height of the enclosure is 5 meters, the main structure is welded with channel steel and angle steel, and the column foundation is reinforced concrete plus embedded steel plates and anchor bolts; Wind load is considered as grade 8 wind; The spacing between columns shall not be greater than 3 meters, and the specific model and wall thickness of channel steel shall be determined according to the calculation results.
广告体距地面500mm;所有槽钢、角钢、钢板等金属构件,必须经防锈、防腐处理;立柱基础混凝土标号不低于C25,埋深不少于500。
The advertising body is 500mm away from the ground; All channel steel, angle steel, steel plate and other metal components must be treated with rust and corrosion prevention; The concrete grade of column foundation shall not be lower than C25, and the buried depth shall not be less than 500.
围挡施工的计划分为几个步骤就是以上相关内容了,如果您对其有疑问的话不妨来我们网站http://www.jnpfjc.com咨询了解吧。
The plan of enclosure construction is divided into several steps, which is related to the above content. If you have any questions about it, you may wish to come to our website http://www.jnpfjc.com Consult and understand.
- 上一篇:工地围挡的怎么样
- 下一篇:详解工地施工围挡三个类型