工地施工围挡会存在的问题及管理方法

来源:http://www.jnpfjc.com/   发布时间:2022-07-06

如今可以看到有非常多的基础建设和建筑,而且这些施工工地因为有些会处于城市内,周围人口复杂,为了保护周围的居民,也为了保护工地内的,这个时候就会设置工地围挡,能够有效的保护人民的。那么工地施工围挡会存在的问题及管理方法是怎样的呢?
Now we can see that there are a lot of infrastructure and buildings, and some of these construction sites will be located in the city, and the surrounding population is complex. In order to protect the surrounding residents and the safety of the construction site, the construction site fence will be set up at this time, which can effectively protect the safety of the people. So what are the problems and management methods of the construction enclosure on the construction site?
工地施工围挡会存在的问题
Problems existing in site construction enclosure
(1)功能形式单一现在的围挡选取更倾向于传统简易围挡,易安装、以拆卸、成本低、可循环使用,但是不美观,往往没有考虑到绿色,而且性不够强。在我考察时看到街道施场所没有使用很好的围挡,对周围的影响很大。
(1) The function form is single. The current enclosure selection is more inclined to the traditional simple enclosure, which is easy to install, easy to disassemble, low cost and recyclable, but it is not beautiful. It often does not take into account the environmental protection, and the safety is not strong enough. During my inspection, I saw that the street construction sites did not use good fences, which had a great impact on the surrounding areas.
(2)区域独立性过强施工区有着特殊的区域性,其结构相对于整个城市是独立的。围挡不论是设计还是安置,都在一定程度上影响力市民的出行以及环境质量,由于围挡大多使用实心材料,市民对于工程的进度一无所知,降低了市民的参与度,不够人性化又不够绿色。
(2) The construction area has a special regionality, and its structure is independent relative to the whole city. Whether the enclosure is designed or placed, it affects the travel and environmental quality of citizens to a certain extent. Because most of the enclosures use solid materials, citizens know nothing about the progress of the project, reducing the participation of citizens, which is not humanized and green enough.
(3)占道施工区围挡占道直接影响了市民的活动范围,并且需要一定的距离,在大成巷的调研中就可以看到,施工区直接占用了一半的步行街道路,使得道路的承载力下降,客流密度变大,造成拥堵、秩序混乱,有着隐患。
(3) Blocking and occupying roads in the road occupied construction area directly affects the scope of citizens' activities and requires a certain safety distance. It can be seen from the survey of Dacheng lane that the construction area directly occupies half of the pedestrian streets, which reduces the carrying capacity of the roads, increases the density of passenger flow, and causes congestion, chaos, and potential safety hazards.
工地施工围挡
工地施工围挡管理方法
Construction site enclosure management method
1.工地大门采用9m宽的标准围挡,6m宽的工地围挡仅用于大门两侧;
1. The site gate adopts a 9m wide standard fence, and the 6m wide site fence is only used on both sides of the gate;
2.道路路口转角处应设置通透式工地围挡,并向两侧各延伸3000mm,保证交通;
2. Transparent construction site fences should be set at the corners of road intersections, and extend 3000mm to both sides to ensure traffic safety;
3.工地围挡临道路侧应设置道路导向标志、反光警示标等警示设施,保证交通;
3. Road guidance signs, reflective warning signs and other warning facilities shall be set at the side of the site enclosure near the road to ensure traffic safety;
4.工地围挡应定期检查、清洗,保证其牢固、完整、整洁;
4. The enclosure of the construction site shall be regularly inspected and cleaned to ensure its firmness, integrity and tidiness;
5.工地围挡内外侧严禁依靠围挡堆放建筑材料、渣土及其他物品;
5. It is strictly forbidden to stack building materials, muck and other items on the inside and outside of the site enclosure;
6.大风、暴雨等恶劣天气,施工单位要加强围挡检查及修缮,保证。
6. In case of severe weather such as strong wind and rainstorm, the construction unit shall strengthen the inspection and repair of fences to ensure safety.
以上就是问题解答的相关内容了,希望能够帮助到大家,如对这一问题还存在任何疑问,都欢迎关注我们网站http://www.jnpfjc.com并咨询我们的工作人员,将竭诚为您服务。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.jnpfjc.com And consult our staff, will serve you wholeheartedly.