济南蓬发建材有限公司为您提供临边护栏、木工防护栏、工程围挡等相关信息发布和相关资讯,敬请关注!
新闻
联系我们
咨询电话
15866735826

联系:张经理

手机: 15866735826

邮箱: 394441862@qq.com

网址:http://www.jnpfjc.com/

地址:山东省济南市章丘圣井工业园

当前位置: 首页 > 新闻中心 > 常见问题

木工加工棚完工后的检查

来源:http://www.jnpfjc.com/   发布时间:2023-01-03

木工加工棚完工后该如何进行检查与验收呢?下面跟随小编一起来看看吧!
How to conduct safety inspection and acceptance after the completion of woodworking shed? Now follow Xiao Bian to have a look!
1.总平面设计
1. General layout design
指定原材料加工区,半成待检产品存放区,半成待检产品存放区,成品合格区垃圾收集区,离地30cm的扶壁建在原材料围栏的存放区,间距2.0m,按照规格型号隔离堆放。
The designated raw material processing area, half product storage area for inspection, half product storage area for inspection, garbage collection area for qualified finished products, and buttresses 30cm above the ground are built in the storage area of raw material fence with a spacing of 2.0m, and are stacked separately according to specifications and models.
2.标志和标志的布局
2. Sign and sign layout
(1)各种原材料堆放标志牌,各种待检工作区,合格产品标志牌应配备齐全。焊接和切割钢筋时,应设置特殊的危险警告标志,以防止氧气和乙炔的易燃易爆。安临时用电警示标志安生产、消防、等安,全文明施工标志。
(1) The signboards for stacking various raw materials, various work areas to be inspected, and the signboards for qualified products shall be complete. When welding and cutting reinforcement, special danger warning signs shall be set up to prevent oxygen and acetylene from being flammable and explosive. Warning signs for temporary electricity use Safety signs for production, fire protection, environmental protection, and civilized construction.
(2)钢筋加工棚平面布置图,加各种钢筋结构尺寸示意图,各种钢筋尺寸误差标准要求图。
(2) Layout plan of reinforcement processing shed, plus schematic diagram of various reinforcement structure dimensions, and standard requirements diagram of various reinforcement size errors.
木工加工棚
(3)管理人员、质量检查员和操作人员的职责和制度。
(3) Responsibilities and systems of management personnel, quality inspectors and operators.
(4)钢筋加机械设备操作规程等。
(4) Operating procedures for reinforcement and mechanical equipment, etc.
3.临时用电
3. Temporary electricity
(1)加工棚内使用的管道须使用合格的材料,不得使用废料;施工现场架设电力线路应严格遵守相关要求和规定,确保线路安完整、美观;
(1) The pipes used in the processing shed must be made of qualified materials, and waste materials are not allowed to be used; The erection of power lines at the construction site shall strictly comply with relevant requirements and regulations to ensure the safety, integrity and beauty of the lines;
(2)电源和照明线路须分开,配电箱内的多路配电应标明门、锁和防雨措施;临时用电符合规定,因此须采用TN-S接零保护系统,须实现三级配电二级保护和“一机一箱一闸一漏”保护措施。
(2) The power supply and lighting lines must be separated, and the multiple distribution in the distribution box should be marked with doors, locks and rainproof measures; The temporary power supply meets the requirements, so TN-S neutral connection protection system must be adopted, and three-level power distribution two-level protection and "one machine, one box, one switch and one leakage" safety protection measures must be realized.
(3)夜间施工要保证照明设施和足够的亮度。
(3) Lighting facilities and sufficient brightness shall be guaranteed for night construction.
以上内容主要讲解了木工加工棚检查与验收,本期文章讲解到这里就结束了,更多精彩内容可以来我们网站http://www.jnpfjc.com进行咨询了解!
The above content mainly explains the safety inspection and acceptance of the woodworking shed. This article ends here. More wonderful content can be found on our website http://www.jnpfjc.com Ask about it!